top of page
card-tank-battery-drone.jpg

EMERGENCY SHUTDOWN VALVES
FAIL-SAFE ISOLATION

Actuated ESD valves close the gas supply to the combustor on a flame failure, BMS shutdown or site ESD signal. Piped, wired and tested with the Profire controller before the unit ships.

INTEGRATED WITH YOUR BMS

  • Proven pneumatic ESD valves, including Kimray

  • Solenoid tied to the Profire BMS for automatic shutdown

  • Fail-closed on loss of signal or supply

  • Instrument air or gas supply with stainless tubing

  • Piping options for single- and dual-inlet combustors

  • Function tested before shipment

card-ecd-vcu.jpg
logo-horizontal-white-outline.png

Enclosed combustors, VCUs, complete ECD packages and OOOOb stack emissions testing. Engineered and built in the USA.

Steve Hogue  |  720.862.6862

Steve@CrimsonEnergyLLC.com

​

HQ: Loveland, Colorado

Offices: Midland, TX  ·  McKinney, TX  ·  Gulf Shores, AL

Cartagena & Cali, Colombia

© 2026 Crimson Energy, LLC. All rights reserved.

bottom of page